Polebridge Road over Conesus Outlet Bridge Replacement

Preconstruction


precon1
Existing twin arch was heavily deteriorated, parapet walls were failing.

Demolition


removal1
Laid stone, steel arches and fill were removed.

Foundation Construction


sheetpile1
Sheet piling was driven to provide new bearings.

Timber Framing


framing1
Laminated timber girders and deck panels were installed on sheet pile bearing.

Paving


paving1
A waterproof membrane was applied prior to final paving.

Completion


final1
Guiderail and signs set, streambank protection placed.