Preconstruction

Existing twin arch was heavily deteriorated, parapet walls were failing.
Demolition

Laid stone, steel arches and fill were removed.
Foundation Construction

Sheet piling was driven to provide new bearings.
Timber Framing

Laminated timber girders and deck panels were installed on sheet pile bearing.
Paving

A waterproof membrane was applied prior to final paving.
Completion

Guiderail and signs set, streambank protection placed.